Shower installation detailed steps all-round strategy

Generally, the manufacturer of showers will provide installation services, but if you use online shopping, you may need to install it yourself. In addition to carefully studying the installation instructions, DIY installation showers should also pay attention to some installation sites, especially the pipelines during installation. The size and aperture size must be accurate, and the installation height of the shower shower is also very important.

Shower installation process:

1. After the quantity is good, the process of tube threading, lead-lead oil, and entangled twine should be carried out. The elbow should be put on the elbow, the lead wire should be smeared with lead oil, wrapped in hemp, and finally installed on the nozzle.

2. When the shower and the copper inlet are docked, tighten the nut by hand, and the screw holes on the disc are leveled and marked. Then remove the shower and make a hole with a diameter of 40mm and a depth of 10mm, and cut the lead roll into the hole and top it.

3, the copper inlet should pay attention to the lead oil padding to prevent rust and oxidation, the wooden disc should be used to fix the shower disc and the wall.

4. When installing the shower water, the shower should be straightened, the disc should be close to the wall, and the mark should be drawn. The hole with a diameter of 40mm and a depth of 10mm should be cut into the top of the lead roll, and the nut should be padded with the hand. Tighten and finally the disc is fixed to the wall with wood screws.

Installation points of the shower:

1. Generally speaking, the shower head and faucet of the shower are all installed and used. The faucet is 70-80 cm from the ground, the shower column height is 1.1 m, the length of the faucet and shower column joint is 10-20 cm, and the shower is from the ground. The height is between 2.1 and 2.2 meters, and consumers should fully consider the size of the bathroom space when purchasing.

2. The cold and hot water supply pipes must not be reversed. Under normal circumstances, the left side of the faucet is a hot water supply pipe, and the right side is a cold water supply pipe. Except for special signs. After the installation is completed, remove the blisters, showers, etc., which are easy to block the fittings, let the water flow out, completely remove the impurities, and then put them back.

3. The tools attached to the faucet should be retained for future maintenance. When disassembling the water inlet hose, do not wrap the sealing tape. Do not use a wrench and tighten it directly by hand. Otherwise, the hose will be damaged. The wall-mounted faucet determines the length of the elbow according to the need, otherwise the elbow exposes too much wall surface, which affects the appearance.

4, the general family choose hand shower, lifting rod, hose and wall mounted shower faucet combination shower is the most affordable, can be used with shower room, can also be combined with a bathtub. The height of the lifting rod is installed, and the height of the uppermost end is 10 cm more than the height of the person. The choice of hose length for showers varies from person to person. If you want to use a shower to wash the floor of the bathroom, you can choose a longer one. In general, 125 cm is enough.

This classification including Steel Profile, usually they are used for construction purpose, also some customer use them for car , billboard, stents, fence etc.


Jinan Xin Jiyuan is specialized in ERW and Seamless square&rectangular tube/pipe, hollow section structure pipe, and galvanized pipe in China. Annual output reaches 1.5 million tons. We have 2 production lines, could producte square pipe from 20*20*1mm to 600*600*35mm, rectangular pipe from 20*30*1.2mm to 600*800*35mm. Xin Jiyuan can manufacture square rectangular pipes as per the standards of ASTM A500, JIS G3466, EN10219, EN10210,DIN2240, BS1387, AS1163. Steel Grade: A500 GR.A/B/C/D, SS400, STKR490, S355JR, S275JO, S275J2, S355J0, S355J2, C350, C350 L0 ect.

We have three heat treatment furnace, two furnace of 100 mt, and one furnace of 300mt, that means we could finish 500mt goods at the same time.


Steel Profile

Steel Profile,Stainless Steel Profile,Carbon Steel Profile,Galvanized Steel Profile

JINAN XIN JIYUAN SPECIAL SECTION TUBE CO., LTD. , https://www.squarepipes.com