Eight decoration traps that must be prevented during the decoration

For the vast majority of families, decoration is a laborious and laborious task, and many companies have a variety of "renovation pitfalls" that make it hard to prevent them from falling into one of them. We are here to publicize all kinds of "cat tiredness" in home decoration and teach everyone how to "brighten their eyes."
Trap one: Grasp the owner's concern for the individual price of the psychological, deliberately fuzzy quotes and process descriptions, such as materials, specifications, grades and so on.
Small companies mostly adopt fuzzy quotations and low-price cut-ins, while large companies offer relatively transparent quotations. Consumers should pay attention to the quotation provided by the decoration company and should clearly express the size, practice, materials (including brand, model), unit price, and process standards of each part. For example, it is not possible to generalize a detailed project by “how much is a meter of pipelines”. It is also necessary to explain how many lines each pipe is wearing, whether it is several square meters of wire, whether it is copper core or aluminum core, origin, etc.; The number of square meters of the body is calculated by the orthographic projection, or by the expanded area, the level of the decorative panel, what kind of material is used inside the cabinet, whether it contains hinges, handles, rails, and other hardware; whether the overall quote contains Some grassroots projects are dealt with, such as wall eradication and wall equality.
Pitfall 2: Malicious items on the quotation list give the illusion that the overall price is cheap, such as missing items such as door pockets and window coverings. When the construction is completed, they will be brought back to the owner. At that time, the owner has to add items.
Many owners often care about the total quotation, and ignore some specific items on the quotation. After the project is completed, they find that they have tens of thousands more than expected. Therefore, after the landlord obtains the quotation, he must read it carefully to see if there is any work that must be done and he has deliberately deleted it. In addition, the owner should inform the designer of his detailed requirements before the quotation. In addition to the estimated total cost, the owner should also tell the designer how much you can tolerate. In general, the increase or decrease in the engineering part is controlled at 10%. The best is that it will limit the quotation made by the designer to a certain extent and avoid unnecessary overspending in the future.
Trap 3: When signing the contract, deliberately planting "foreshadowing", as stipulated that "if the original decoration brand material is out of stock, Party B (renovation company) can temporarily replace the same type of material", during the construction process, the excuse goods are used up. Subsequent charges, earning the difference.
It is impossible for the master to supervise the work on the spot at any time. To prevent being “stuck”, it is necessary to understand the difference in the prices of similar products on the market and whether the environmental protection coefficient is equivalent. For example, a good waterproof coating for three or four hundred yuan a barrel, and many brands of waterproof paint only a few tens of dollars a barrel; the same species of products produced in different regions, the price is not the same, such as Langfang production of Nippon Paint than Shanghai The production is cheap; some construction teams told the owners that the tiles purchased were first-class products. It was the best. In fact, most brands of tiles have superior products. If the owner does not have time to purchase the main material and needs a decoration company to purchase, it is best to provide a detailed list, indicating the brand, manufacturer, origin, model, product grade, required quantity, etc., and remember to request an invoice.
Trap #4: Persuade the owner that the project for hydropower reform should be done well. You can't save money on this map. Otherwise, you will have more trouble in the future, and then you will have to use it to create some unnecessary waste.
It should be noted that hydropower reform is the most profitable project for home improvement companies, and landlords should take this off. For example, in general, four or five square meters of bathroom, some decoration companies will recommend that all walls be waterproof. In fact, as long as the wet and dry partitions are made, besides the shower area is full, 30 cm can be returned on other walls. In the early stage of the transformation, the owner must also pay attention to whether the hydropower reform cost is included in the total quotation, whether the switch box, switch panel, small accessories, etc., and installation are additionally charged. Moreover, the line is buried in the wall and the outside line is not the same price.

Pitfall 5: The measurement standard is not clear, and the method of over-reporting the number of meters, the number of square meters, or the method of repeated pricing is used for charging.
In the laying of floor tiles, wall tile adhesion, wardrobe, bookshelf measurement accounting, the owners are most likely to be exploited. Many home improvement companies have internal standards for dimensional measurement. Take the measurement method of bookcases as an example. The general price quotation will only indicate how much money per square meter, without specifying the bookcase thickness and the distance between the vertical plate and the horizontal plate. Some companies will require the additional settlement of the excess cost, based on the size of the bookcase exceeding the standard. In addition, most companies charge fees for partitions, door panels, drawers, handles, etc., in addition to the frontal area of ​​the cabinet.
Trap 6: "reduction of material" can be blocked, "staggering" is difficult to prevent. Some companies will resort to omitting a certain procedure and reducing the number of processes in order to extract huge profits.
"Stealing" relates to the quality and actual cost of the entire renovation. Decoration companies often use the following methods to “steak work”: According to the regulations, after all pipeline construction is completed, the construction personnel must carry out water injection and pressure tests, and some construction teams give this procedure to save the progress; some construction When the team made wood keel, it omitted the procedures of brush waterproofing and fire-retarding paints, which buried potential safety hazards for the future. When some construction teams brushed paint, they brushed enough times, but each brush was not careful enough and still existed quality. problem.
Trap 7: Concealed works, such as concealed wiring for electricity, underground laying of water pipes, and renovation of sewers, etc., will not be easily found because they are covered by skins and floor tiles. Some construction teams will cut corners during construction or report excessive quantities during settlement.
Although it is a hidden project, the owner still has to understand clearly and clearly, so it must be checked and accepted on site before sealing and covering. Some construction teams do not walk horizontally but walk obliquely when they are walking. This can save some of the lines and earn the difference. However, for the owners, it not only causes economic losses, but also makes it difficult to change the line later. . Therefore, after the completion of the project, the owner should remember to ask for drawings of the transformation of the hydropower line.
Trap 8: Some of the decoration companies issued to the owners of the contract annex is the old version, in the payment method, compensation methods and environmental calculation methods are not perfect.

Construction Acceptance Decorating Delicatessen Porcelain Decoration Decoration Coatings Doors & Windows Doors Decoration Home Decorating Decoration Company Okay Drawer Cabinets Bathroom Tiles Bathroom Doors Bathroom Wall Tiles Bathroom Size Bathroom Tiles Bathroom Waterproof Price Overall Bathroom Toilet Design Toilet Waterproof Toilet Door Size Tile Price Tile Size

The outside of SAFETSHINEwork uniform jackets are made from oxford cloth that is washable, soft, and hygroscopicOur fashion jackets, though, are just that - fashionable yet highly functional. Grey in the daytime but reflective at night, they have a soft, smooth exterior. Public, utility, and construction staff need to stay safe in low-light or in the dark, but so does everyone else. Worry no longer - for work or everyday use SAFETSHINE has you covered, both literally and figuratively. We help others to see you in the dark like a cat`s eye sees at night - by making the best use of whatever light is available! Regardless of the design and materials, all carry 380-score reflective striping for maximum shine, with jackets made to EN20471 keeping reflectiveness up to 25 washings. Numerous successful designs have already been made, with more offered each month.

Reflective Doll

Cute Animal Doll,Reflective Doll,Competitive Doll,Refelctive Doll

Yongkang Oti Safety Products Industry Co., LTD , http://www.qbanppe.com