The old house of hydropower reform process and matters needing attention

For the old house's hydropower reform , the old house referred to in this article refers to the use of more than 10 years, especially the construction of multi-storey buildings before the 1990s, and houses that need to be renovated and reconstructed. Hydropower renovation is the core foundation project in the renovation of old houses, and whether the preparation work for hydropower design is directly related to whether or not the concealment project can be completed, directly affecting the comfort of future life. Today I would like to introduce to you the relevant knowledge of the old house's hydropower reform . I hope to help friends who have this need!

Old house hydropower reform price

First, weak installation materials and installation prices

Weak electricity includes two points:

1. Lines: Cables used in telephone lines, network cables, television lines, audio lines, audio lines, video lines, background music, etc.

2. Line pipe: PVC rigid flame-retardant electrical pipe diameter D16 line pipe 3 weak electricity (telephone, television network cable) to wear the tube alone. Switch socket bottom box 86 type 10 yuan / month; 118 type 15 yuan / month. Add 16 information integrated boxes plus 160 yuan/set. After ensuring that there is no joint in the pipe and the trap pipe is buried, fill it with plaster or cement mortar. Dark pipe price: 28 yuan / meter. Ming tube price: 18 yuan/meter

Material: 1 PVC pipe thickened cold bend pipe wire.

Second, strong electric installation materials and prices

Flame-retardant electrical pipe not more than 3 threads, such as over 3 roots plus 5 yuan per meter. The wires in the tube have no joints, and the junction box is used at the point of distribution. Switch socket bottom box 86 type 10 yuan / month; 118 type 15 yuan / month, 4 square meters plus 10 yuan per meter. Multiple pipes and slots are billed by multiple dark lines. After grooving the tube, fill it with plaster or cement mortar.

Dark pipe: 35 yuan/meter

Ming tube: 25 yuan/meter

Material: PVC wire thickened cold bends, wires.

Third, the waterway transformation

1, 20PP-R water pipe (concealed): 60 yuan / m b.20PP-R water pipe (surface mounted): 45 yuan / m c. launching installation (50PVC pipe): 60 yuan / m PS: PP-R The tube is Weixing or Kinder. The water is a plastic pipe

2. Each meter has one equal-diameter and different-diameter pipe sleeves and one 90-degree elbow. 2, does not contain the valve hardware 3,25 water pipes plus 10 yuan per meter 4 less than one meter according to one meter calculation 5, drilling another charge, bearing wall 40 yuan / month, non-load-bearing wall 20 yuan / 6 PP-R tube Are thick skin 2.8 hot water pipe. 7 Under the water pipe, the 50 is calculated to be greater than 50 and negotiated separately.

Note: This price is for reference only! Due to geographical differences, of course, the price will be different. For more details on the prices, please refer to the local distributors!

  

The old house hydropower transformation process

What the owner needs to prepare before remodeling:

1. The house is completed and the decoration procedures have been completed;

2. Changes in the interior wall structure (removal of walls or new walls);

3, furniture, electrical basic specifications, placement

4, the top ceiling lamp layout

5, floor plan and modeling lamp layout

6, other personalized needs

7, kitchen cabinet designer to determine the kitchen socket, the basic positioning of the lamp

8、How to supply hot water for your home, gas heating or electric water heater or other hot water supply

9, determine the water heater size specifications, ordinary bathtub or Jacuzzi

10. Make an appointment in advance for the accurate positioning of the hydropower engineer's home planning and make an on-site project budget.

Before the construction, sign the hydropower reform contract

1. Make an appointment in advance for the accurate positioning of the hydropower engineer's on-site planning, and make a project budget on site. If the construction does not change one point, the error value should not exceed 10% to avoid over-expenditure during settlement;

2. The water circuit reform contract should be determined: water pipes, pipe fittings, BV single copper wire, UPVC flame-retardant electrical pipe, network cable, television cable, telephone cable, audio cable and other material brand models to prevent material counterfeiting;

3, hydropower reform contract should indicate the unit price of each purpose, the total budget, and the error value

During Construction: Precautions in the Construction of Water Circuits and Some Regular Sizes

1, shower outlet from the ground 1100mm

2. Satellite TV sets the south facing windows of the room. The southwest direction is commonly used by taiwan Chinese live (entertainment, national language), and the southeast is CNN, BBC, HBO and other full English programs. Place specific locations based on personal preferences.

3, socket position and the original socket to maintain a relatively consistent height, generally 300-350mm

4, dual control switch from the ground 850mm

5, wall-mounted TV power supply distance 1100-1300mm

Old house hydropower transformation precautions

1. It is not advisable to slot the jumper pipe on the ground to avoid the pipeline area.

2. It is not advisable to punch and fix the pipeline at the ground to avoid the pipeline area.

3, open the cassette to avoid the steel bar can be moved up and down or even change the position, prohibiting broken ribs.

4, can not open long transverse trough: the load-bearing wall is easy to damage the structure, light wall due to the force of the upper and lower three sides, after the broken tendon will cause trouble.

5, wire and pipe should not go inside the plaster line, easy to cause dead bend, dead line

6, PVC pipe diameter less than 25 bend pipe bender, can not add bends elbow; circuit is not a show, bends to avoid bending at right angles.

7. Except the kitchen and the kitchen, the circuit should take the pipeline as far as possible (except the top ceiling), and the PVC pipe is used to bond the interface.

8, the first line of the layout is completed, fixed is completed, and then threaded with steel wire

9, waterproof construction should use waterproof coating

10. Waterproofing works should be done after the hidden construction is completed and accepted

11. Do two water storage tests after waterproof construction is completed

12, the bathroom waterproof layer should not be less than 1.8 meters

13, floor drain, Yin Yang angle, pipelines and other places to do more waterproof

14, floor drain to use deodorant floor drain

15, hot and cold water left hot right cold

16, try not to walk from the ground

17, cold water pipe in the wall should have 1CM protective layer, hot water pipe is 1.5CM, so the slot to open deep

18, PPR pipe is installed to consider the thickness of the paste tiles, so that the pipe will not be exposed

19, the washing machine to consider whether it is drainage or drainage

20, weak electricity can not be worn in the same pipe

21, left zero, right phase grounded

22, power socket 300, switch 1.4 meters

23, switch not installed behind the door

24, a lot of sockets should be good

25, high power appliances with 16A socket, such as electric oven

26, the cassette should be used well

27, cassette must be matched with the panel, otherwise it may not be installed

28. The cross-sectional area of ​​the wires in the PVC wire conduit must not exceed 40% of the cross-sectional area of ​​the wire conduit

29, bedroom air conditioning do not face the bed

30, air conditioning hole to consider outward tilt, otherwise the rain will come in

31, lights try to consider dual control

32, the best bathroom to install splash socket

33, on the balcony to consider a socket

34, wire troughs should be horizontal and vertical, row photos, later use it

35, public flue to install the reverse valve

36, bought the appliance must be good for workers to read the instructions

37. Instructions and warranty cards must be kept

  

How to perform immediate acceptance after water circuit construction

1. Water acceptance: After the water reformation is completed, the cold and hot water pipes have been reformed with a hose to ensure that the hot and cold water pipes of the entire indoor pipe are pressed at the same time; the pressure suppressor is installed, the pressure suppressor is filled with water, and the air in the pipe is let off, so that the entire circuit is inside. It is all water; close the water meter and the outside gate valve (make sure to protect it). Then began to suppress, the experimental value is 1.5 times the working pressure, 30 minutes impermeable, pressure drop does not exceed 0. 05MP is qualified

2. Strong power acceptance: Use 500V insulation resistance meter to test the insulation resistance value of each circuit, and at the same time, it can test the quality of the used wires. Wires that do not meet the standard may be broken down;

3. The weak current adopts the special tool test: The special network test tool tests whether the 8-core signal of the network is unimpeded; the carrier's copper shaft cable test tool, the multimeter and other complete tests are qualified before the next construction work.

4. It must be noted that the completion of the hydropower reform must be checked and accepted, and it will be too late to wait until the completion of the construction of other projects.

Editor's summary: The price of this hydropower reform must be known, because each home will have hydropower reform, master the approximate price of hydropower reform, in order to do a good job in fitting out the budget for the price, to avoid overspending. For more information, please continue to pay attention to our website, follow-up will show more exciting content.

50 old house renovation decoration design old room living room old room renovation family old house 60 flat old room old house hydropower reform

It can be equipped with a scrolling display that displays 300-500 words of display content. It can also be equipped with intelligent infrared probe anti-collision device, which can automatically return to work when people or foreign objects are 20-30CM, thus ensuring the safety of vehicles and pedestrians.It can automatically open and close when automatic clutch is cut off. Manually open and close when manual clutch is cut off. The control system has control panel, push button switch, and other requirements. Equipped with wireless remote control.The door body is made of high-quality stainless steel and aluminum alloy profiles, and is hinged by the parallelogram principle. The drive is driven by special motor, worm and worm gear deceleration, and has automatic clutch or manual clutch. 

Electric Retractable Gate

Factory Sliding Retractable Gate,Aluminum Alloy School Sliding Gate,Automatic Electric Single Double Gate,Store Retractable Gate

Shenzhen Hongfa Automatic Door Co., Ltd. , https://www.hongfadoor.com