ZW non-blocking self-priming sewage pump installation drawings and instructions

ZW non-clogging self-priming sewage pump how to install, you need to pay attention to the details? ZW clogging self-priming sewage pump installed properly or not on the pump operation and life have a greater impact, we must carefully ( Standard pump pipe installation see diagram). Next, Xiaobian bring ZW non-clogging self-suction sewage pump installation drawings and instructions, as follows. ZW non-blocking self-priming sewage pump installation drawings and instructions 1, ZW non-clogging self-priming sewage pump suction inlet installation height try not to exceed 5 meters, should pay special attention to the suction pipe sealing, so as to avoid leakage and affect the pump Self-priming ability and normal operation. 2, ZW non-clogging self-priming sewage pump outlet should first install a vertical pipe (usually 0.4 to 1 meter) and pressure gauge, and then install the outlet flow control valves and other piping. 3, to a reasonable allocation of pump inlet and outlet pipe length and diameter, reduce unnecessary head loss along the way. (Can refer to straight tube friction loss profile for estimation) 4, long-distance transmission should use a larger diameter. Pump piping should have its own support, the pump itself is not allowed to withstand the load pipe. 5, discharge pipe installed check valve should be installed in the outlet flow control valve outside. From the above introduction, we know that ZW non-clogging self-suction sewage pump installation or pay attention to many details, one of the details did not handle well, may affect the operation of self-priming sewage pump. Therefore, the operator must be rigorous in the installation. Further Reading: pump valve pipe fittings Exhibition 2016 Exhibition of Information Industry, Internet (Xiamen) Technology Co., Ltd. Author: Asian pumps Network Editor: Small L (QQ / micro-channel: 676824158) http://beng.liuti.cn/ (Service Hotline: 400-6030-811)