Laying Floor Tiles Precautions Do you build a little partner?

In general, to achieve the desired laying effect, the quality of floor tiles accounts for 70%, and the laying skills account for 30%. Without a good floor tile, it is difficult to obtain good results even if it is laid; but even if there are high-quality floor tiles, floor tiles are wasted if they are not laid. So, what are the precautions for laying floor tiles ? Let's take a look with Xiaobian.

Laying floor tiles matters needing attention

Before paving, tiles often need to be soaked in clean water for 20-30 minutes, can only be filtered after the water to paving, otherwise it is easy to tile after the evaporation of water evaporation tiles. Before use, check whether the color number and size marked on the outer packaging are the ones they order, and whether the unified color brick has defects such as chromatic aberration or broken wire. Only use the uniform color number to make the color uniform. The cement label used for paving should be low-grade, and the cement thickness should not be too large, generally no more than 5mm. Acceptance should pay attention to the ceramic tile must be solid, no empty drums, no cracks, no skew, missing corners and other defects.

Tile Laying Considerations:

1, before the tile shop to spend sampling should be to see if the grade, color and sample look the same, if confirmed, it is best to let the person in charge of construction sign, or immediately notify the tile vendors.

2. If the wall is a putty wall or a calendered concrete wall, the roughening must be done first. Wall tiles must not have less than 1/3 bricks.

3, the ground should be fully wet, play a horizontal line on the wall and put the line on the ground pre-arranged to ensure that the low bricks in all rooms on a uniform level.

4, floor tiles is best to use "dry shop" method.

5, bathroom tiles should be set aside about 1% of the slope, and lower than the outer floor tiles about 10mm. The slope of kitchen tiles should be appropriately reduced.

6. The angle of 45 degrees should be used when facing the angle of Yang Yang. The lower edge of the waist line should be the upper edge of the window.

7. After the wall tiles have been plastered for 3-5 days, finish the construction again.

Wall tile stickers note:

1. Before paving, first do grassroots treatment, clean up the various dirt on the wall, and water and moist one day in advance.

2. The wall brick subsidy line should be selected and should be soaked for more than 2 hours to dry the surface water for use.

3, before the laying of the first line placement and row of bricks, non-complete bricks should be discharged in the secondary area or the corner, preferably in the direction from the bottom, starting from the bottom of the whole brick laying to ensure that the entire bathroom decoration effect . Each wall should not have two columns of non-integer, and the width of non-full width bricks should not be less than 1/2 of the whole brick. When sticking a wall tile, it should be noted that half a brick should be at the top and brick seam width 2-4MM.

4. The cement mortar should be placed on the back of the brick, and one wall should not be tiled to the top to prevent it from falling.

5, due to the easy deformation of the kitchen and toilet pipes caused by brick cracks, so the corners of the wall tiles can be used stainless steel strip stickers.

Tile paving notes:

1. Before paving bricks, it should be soaked with water and moistened.

2. Prior to laying, the mortar thickness of the bonding layer should be determined according to the design requirements, and the crosshairs should be pulled to control the thickness and surface flatness of the floor tile.

3, stone floor tiles should be maintained when the horizontal position, with a rubber hammer to make it closely bonded with the mortar, while adjusting the surface roughness and seam width, seam width is generally 3-5MM.

4, according to the positioning of bricks line by line pull line, paving mortar with a ratio of 1:3, mortar thickness of 15-20MM.

5. Apply about 10 bricks per paving, check the surface flatness and slope with a ruler, and adjust the brick seams properly to keep the tiles clean.

6, when the bathroom floor tile, should maintain a certain slope along the floor drain position, to ensure smooth drainage in the future.

The above notes on paving floor tiles are briefly introduced here and I hope to help you. For more information, please visit this website. Stay tuned.

Flooring floor tiles considerations

Aluminum and Stainless Steel Handle Multi-tools

All Black Mini Multi Tool,Small Multi Pliers,Aluminum Mini Tool,Mini Multi Use Hand Tool

Easy-Go Outdoor Co.,Ltd. , https://www.yjeasy-go.com