Method for commissioning forced mixer for supporting equipment of concrete mixing station

The working conditions of any component of the concrete mixing plant will affect the overall situation. There are many customers who ask about the JS mandatory concrete mixer debugging to pay attention to what matters, today Xiao Bian answer this question for our customers and friends.

1. Check whether the smooth oil of each gear box and each smooth part is enough.

2. Check that the wiring of the motor and the electrical components is reliable, and that the distribution box enclosure must be firmly grounded. The zero line of the power supply must be delivered to the terminal board N in the distribution box. All the pipelines should be properly installed to prevent the crushing of the power supply from hitting a fault.

3, start the mixing motor, the direction of rotation of the two half shafts should be in common with the sign indicating direction, such as the wrong direction, should change the power wiring.

4. Close the discharge door, and then participate in the required mixture in the hopper and promote the hopper. The hopper should work smoothly and stop freely in the desired orientation of the trajectory. If there is a slippery appearance, it should be put into the bottom of the pit first, and then adjust the big nut on the brake motor.

5. Start the unloading organization. The opening and closing of the unloading door should be exactly in place. Start the pump to suspend water, and the water supply system should work normally.