Nine strokes to check the doors and windows, come and pick up!

When the renovation of the new house is over, many people are eager to move in and live to feel the extraordinary feeling of the new home. Of course, before this, the acceptance of new homes is a very important step. Acceptance is not only an inspection of the effect of the decoration, but also a test of its quality. Today, Xiaobian teaches you about the skills of accepting doors and windows, so that your new home has a safe guarantee!

1. True and false identification of profiles: Look at the protective film on the surface of the profile; secondly, see if there is any anti-counterfeiting mark on the wall of the concave wall (so-called bar code), call the manufacturer of the profile on the protective film, according to the prompt quotation, you can get Know the truth.

2, steel lining inspection: use the magnet on the form you want to check, can be attached to the form, indicating that the manufacturer added steel lining in the profile cavity, and vice versa. As for the thickness of the steel village, in addition to knowing in the processing factory, you can also listen to the electric hammer to hit the sound of the steel village in the window frame when the installer fixed the window frame, and feel the penetration is laborious.

3, glass: good quality glass without spots, waterless lines (inner glass depends on whether the glass is clear and clean).

4. Whether the sash is slippery on the sash track, whether it is fine or not (depending on the quality of the pulley).

5, hardware inspection: whether the use of the hardware brand required for signing (whether it is light or not, whether it is good). 6. Swing series: Whether the opening and closing is light; whether it is strict after closing.

7. Whether the screen window is pushed or pulled, is it smooth?

8. The verticality of the window frame: It is best to measure with a horizontal ruler; you can also push and pull the sash to the position close to the window frame, leaving a slight gap. At this time, check whether the gaps in the upper, middle and lower are the same size. If the upper, middle and lower gaps are as large, it means that the window frame is vertical; otherwise, the window frame is not vertical.

9. The processing of the gap between the window frame and the wall. According to the construction requirements, at least 1 cm gap is left between the window frame and the wall to facilitate the filling of the building glue (first use the styrofoam to fill the gap, at least 90 minutes, the foaming of the running out is leveled, and then used again. Waterproof glue for surface treatment).

[Follow the WeChat public account "Jiuzhengmen Window Network" to view the latest hot article "Brothers, selling doors and windows, this is not good work..." More industry exchanges, please join the Jiuzhengmen window network exchange group]

This category is formate, which includes Calcium Formate, Sodium Formate, Potassium Formate.

1. It is extensively used in oil field industry as drilling fluid with excellent performance;

2. As the camouflage acid in the leather industry;
3. As reducing agent in print and dyeing industry;
4. As road snow-dissolved agent, early strength agent of cement paste, and in carbon black manufacture, leaf fertilizer and other industries.

Formic Acid Salt

Methanoic Acid,Formic Acid Merck,Formic Acid For Sale,Formic Acid And Sodium Formate

ZIBO JUNTU INTERNATIONAL TRADE CO.,LTD , https://www.juntuchem.com